LOCATION
Alliance, NE
LOOP TRACKS
8,114 Track Feet
BNSF SETOUT TRACK
522 Track Feet
TRACK FEET TOTAL
8,636 Track Feet
SERVICES
Engineering, Construction
360 Rail Services’ staff have performed rail planning, surveying, and infrastructure design and construction for a rail-served grain transloading facility in Alliance, NE. This project included designing and constructing a loop track and setout track to allow grain cars to be loaded. Our experienced engineers and construction team created a facility in limited space capable of supporting an entire unit train.
The 360 Rail Services expert team delivers outstanding solutions and provides value to every project.