Aggregate Unloading Facility

Overview 

 

LOCATION
Kelim, CO

AT-GRADE CROSSING
2

UPRR LEAD TRACK
2,700 Track Feet

TRACK FEET TOTAL
11,000

LOOP TRACK
6,800 Track Feet

BAD ORDER TRACK
1,500 Track Feet

PERIOD OF PERFORMANCE
January 2016–December 2017

This facility is a destination point for Martin Marietta to receive and unload aggregate materials from their Granite Canyon location. 360 Rail Services provided the design and construction of this facility, including a single track siding, track loop, and a bad order track with unit train capacity. We overcame numerous challenges in this project, including a major gas line across the property.

Maintenance process
Engineering_image1-1

Our engineers successfully designed the facility in a way that did not disturb the gas line. Additionally, due to the facility's proximity to a residential area, provisions were made for sound limitation, including a 20-foot high berm. Finally, our team overcame grading challenges posed by the facility's conflicting slope and the surrounding terrain.

We Surpassed Expectations On These Railway Projects

The 360 Rail Services expert team delivers outstanding solutions and provides value to every project.

Crude Oil Unloading Facility
Crude Oil Unloading Facility

360 Rail Services' expert team helped to accelerate the construction schedule of this New Orelans facility from 18 months to 8 months.

Read More About the Project
Cheyenne Logistics Park
Cheyenne Logistics Park

360 Rail Services coordinated this project with state, municipal, military, and railway stakeholders.

Read More About the Project
Grain Transloading Facility
Grain Transloading Facility

Our experienced engineers and construction team overcame space limitations to create this facility capable of supporting an entire unit train in Alliance, NE.

Read More About the Project

LET'S GET TO WORK

Receive a Complimentary Concept