LOCATION
Kelim, CO
AT-GRADE CROSSING
2
UPRR LEAD TRACK
2,700 Track Feet
TRACK FEET TOTAL
11,000
LOOP TRACK
6,800 Track Feet
BAD ORDER TRACK
1,500 Track Feet
PERIOD OF PERFORMANCE
January 2016–December 2017
This facility is a destination point for Martin Marietta to receive and unload aggregate materials from their Granite Canyon location. 360 Rail Services provided the design and construction of this facility, including a single track siding, track loop, and a bad order track with unit train capacity. We overcame numerous challenges in this project, including a major gas line across the property.
Our engineers successfully designed the facility in a way that did not disturb the gas line. Additionally, due to the facility's proximity to a residential area, provisions were made for sound limitation, including a 20-foot high berm. Finally, our team overcame grading challenges posed by the facility's conflicting slope and the surrounding terrain.
The 360 Rail Services expert team delivers outstanding solutions and provides value to every project.
Receive a Complimentary Concept